It has been a VERY slow week and we haven't made a whole lot of progress. There have been some behind the scenes things going on that I can't quite share but other than that it has been painfully slow! We are still waiting on the tile which hopefully will come soon because the tile guy is supposed to start on Monday and he can't start if he doesn't have any tile. Good thing they just announced that they are giving us more additional days because I am probably going to be using them!
Good news is the marble is in production! We finalized the template and layout so they are going to begin the fabrication. I cannot wait until it gets installed because it really is going to be a showstopper.
I still haven't fully decided on a paint color. I went to Benjamin Moore and got four more white paint samples. I have been dead set against painting the bathroom white since day one because I truly wanted a dark and moody bath but I want the marble to be the star of the show so I really think white will be the winner. Its just a matter of which shade. I'd really like to find a creamy white that has red undertones to hopefully pull out the pink in the marble. However, that my friends is easier said then done. BUT I think I may have found a winner with Benjamin Moore's Pink Opulence. It really checks all of the boxes because it reads white but in the right light you can see a faint pink but I am still trying to convince myself white is the way to go so stay tuned who knows what will happen this week. Want to be clear. It's not that the pink and the gray Roman Clay won't look good because they absolutely will. It's been the fact that I never envisioned a pink or a gray bathroom in my home or any room for that matter and I have to live with this so I want to make sure I stay true to the ultimate vision I have for my home.
Let's take a look at our to-do list (items in red are completed and items in italics are new items from this week):
- Gut the entire bathroom
- Schedule and complete the hot mop
- Move the plumbing in the shower
- Install the dam
- Move the shower drain
- Move the electrical
- Install new electrical
- Schedule and complete the drywall repair
- Install the vanity
- Schedule and complete the templating for the vanity top
- Remove the door trim
- Lay the shower tile
- Grout the tile
- Schedule measurements for the shower enclosure
- Order the shower enclosure
- Install the new shower enclosure
- Install the toilet
- Install the fixtures
- Install the baseboards
- Re-install the door trim
- Crown Moulding
- Paint the walls
- Paint the hallway
- Paint the hallway trim and baseboards
- Paint the door
- Paint the trim
- Change the door hardware
- Change the door hinges
- Hang Mirror
- Hang the lights
- Hang the art
- Style
- Photograph